Posts

Showing posts from March, 2021

Schedule revision

  Production (March) Week 4:  Record narration, research web for graphics and backgrounds Post Production (April) Week 1:  Edit new footage, add template for intro credits Week 2:  Sync music into video, continue edit, design end credit Week 3:  Finish editing

Revision

Production March Week 3:        Shot new footage at Japanese Gardens (Hayward, CA)     Equipment used:  video captured with Canon elph 350, Tripod        Week 4:     Finish script, Record narration Post Production April Week 1:     Assemble new footage, include in existing video slides Week 2:     Continue edit, sync music/audio effects Week 3:     Design end credit template     

Schedule revisions

  March (Production) Week 2:  Acquired music file (www.freemusicarchive.org), several images downloaded from japan-guide.com, rough draft of video Week 3/4:  Gather equipment for shoot (dslr, digital video camera), scout for location in San Francisco(Japantown, chinatown) with crew, film intro/ending, meet with professor to discuss progress April (Post) Week 1:  Choose any graphics/effects for post-production, start editing video with Premiere Week 2:  decide on an end credit template, continue edit Week 3:  final stages of editing